
Effendy Udin
Nineteen (19) -year experience in offshore installation field engineering of offshore platforms,marine pipelines,floating unit&subsea system in Far East,Europe,Middle... | Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
*50 free lookup(s) per month.
No credit card required.
Effendy Udin’s Emails ef****@bu****.com
Effendy Udin’s Phone Numbers No phone number available.
Social Media
Effendy Udin’s Location Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Effendy Udin’s Expertise Nineteen (19) -year experience in offshore installation field engineering of offshore platforms,marine pipelines,floating unit&subsea system in Far East,Europe,Middle East, West Africa and ex-Soviet Union countries. Flexible/versatile and have experiences in almost all types of offshore/subsea installations: SURF, i.e. flexible flowline, flexible riser, umbilical/cable laying, submarine hose for SPM Buoy, floating hose, external riser bundle/free standing riser, Mid Water Arch,PLEM,PLET Floating unit&mooring installation,i.e.SPM buoy,FPSO/FSRU,mooring chain Structure,i.e.jacket (jacket launch, dual-block lift&upending, vertical lift, sidelift & upending method, gravity base structure type), topside (topside floatover, multi-module lifted topside), bridge, tower, vent boom Rigid pipeline,i.e.Rigid pipeline (including piggy-back laying), subsea spools tie in, rigid riser (including stalk on riser), pigging hydrotesting, shore approach (including open cut method & horizontal directional drilling), dredging, post-lay trenching,backfilling,pipeline free span rectification Misc works,i.e.load out interface in fab yard, preparation works in MarineBase, derrick barge crane load test, fabrication of installation aids,etc. As installation manager,responsible for all aspects of installation activities: Tech tender works(coordinate/prepare method statement,tech clarification,tech qualification,execution plan,feasibility study,schedule,etc) Workscope write up&tech bid evaluation for subcontractor Preparation works&project mobilization Installation procedure development Schedule planning Materials list development&sourcing Feasibility study,i.e.transportation,lifting,installation methodology Barge set up/anchor pattern Works coordination with all relevant parties Installation aids(conceptual)design,i.e.bumper&guide, protection frame, rigging platform Riggings calc Fab site visit & loadout meeting Field assignment on DLB or vessel As-built document
Effendy Udin’s Current Industry Muhibbah Engineering
Effendy
Udin’s Prior Industry
Mcdermott International
|
Saipem Mediterannean Services
|
Tl Offshore
|
Bumi Armada Berhad
|
Bumi Armada
|
Muhibbah Engineering
Not the Effendy Udin you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Muhibbah Engineering
T&I Manager
Sun Oct 01 2023 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Bumi Armada
Installation Manager
Sat Sep 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jun 01 2021 00:00:00 GMT+0000 (Coordinated Universal Time)
Bumi Armada Berhad
Senior Installation Engineer
Thu Sep 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Aug 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
Tl Offshore
Senior Field Engineer
Wed Apr 01 2009 00:00:00 GMT+0000 (Coordinated Universal Time) — Thu Sep 01 2011 00:00:00 GMT+0000 (Coordinated Universal Time)
Saipem Mediterannean Services
Senior Offshore Installation Methods Engineer
Tue Aug 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Apr 01 2009 00:00:00 GMT+0000 (Coordinated Universal Time)
Mcdermott International
Offshore Installation Field Engineer
Sun Sep 01 2002 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Aug 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time)