
Gregory Offong
• Measurement of building and infrastructural works and preparation of bills of quantities. • Measurement of sub-contractors work... | Nigeria
*50 free lookup(s) per month.
No credit card required.
Gregory Offong’s Emails gr****@to****.com
Gregory Offong’s Phone Numbers No phone number available.
Social Media
Gregory Offong’s Location Nigeria
Gregory Offong’s Expertise • Measurement of building and infrastructural works and preparation of bills of quantities. • Measurement of sub-contractors work and preparation of interim valuation. • Carrying out cost estimation for proposed sub-contractors work. • Taking data and preparing report on daily construction activities, equipment and total man-hours as the staff strength utilize on daily activities with the respective British standard code, which is use for cost control. • Coordinate in preparation of procurement documents base on building materials to be use by sub-contractors for the project execution.• Measurement of building and infrastructural works and preparation of bills of quantities. • Ascertaining the total quantity of reinforcements used monthly and preparation of it’s monthly interim valuation with back ups. • Measurement of sub- contractor works. • Preparation of monthly interim valuation for sub-contractors works and it’s certificate. • Provide cost advises in respect to disputes with sub-contractors. • Preparing daily construction report, daily site staff record and daily site equipment report.• Coordinating the processing of contractor’s monthly applications for payment, and verifying invoice submissions. Reporting on any of the above activities as required. • Review of contractor material/equipment timesheet and manpower timesheet for invoice attachment. • Validating the planning, cost and progress control reports and documents submitted by contractor. • Assisting the EPC contract lead in the organization and maintenance of local project Services. • Assisting the contract lead in the consolidation of the internal reporting to the management. • Preparation of contractual correspondence to be sent to contractor, including costs. • Analysis of contractual correspondence received from contractor. • Preparation of certificates to be issued by company in accordance with the contract, and arrange signature by the parties. • Managing and checking that the assistance to company is provided by contractor according to contract. • Assisting as required, in the management / coordination of local services to company, as directed by the contract lead. • Assisting the contract lead in the follow up the contractual schedule and progress in close coordination with the project services department and package team leaders / management. • Evaluation of contractor change order requests, and assistance, as appropriate, in the preparation of change orders. • Assisting the EPC contract lead in the follow-up and checking of the change order requests issued by contractor. • Assisting in the activities performed by the planning engineer in validating the planning, cost and progress control reports and documents submitted by contractor, as required. • Assisting in the activities performed by the cost control in validating the costs / budget. • Participation in monthly and CO meetings and, upon request from the contract lead, to attend other ad hoc meetings with contractor. • Preparation of the corresponding minutes of meeting.• Measurement of building/civil engineering works and preparation of bills of quantities. • Valuation of Contractors works. • Advice on contractual obligations and claims. • Claim initiation and preparation for contractors. • Evaluation and preparation of change order to be submitted to client. • Produced detailed cost estimates for residential and commercial construction projects. • Developed definitive construction cost estimates based on the analysis of project documentation such as drawings and specifications.
Gregory Offong’s Current Industry TOTAL
Gregory
Offong’s Prior Industry
Julius Berger Nigeria PLC
|
Quantexx Associates
|
TOTAL
Not the Gregory Offong you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

TOTAL
Offshore Quantity Surveyor (OFON 2 Project)
Tue Apr 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Dec 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Quantexx Associates
Quantity Surveyor (Partnership)
Sun Apr 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Apr 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Julius Berger Nigeria PLC
Quantity Surveyor
Sun Apr 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Apr 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
Julius Berger Nigeria PLC
Quantity Surveyor
Wed Mar 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time) — Thu Mar 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time)