
Mehdi Masoudfar
+20 years experience and expertise in PIPNG -MECHANICAL design and engineering ,reinforced by fabrication and manufacturing, procurement,... | Montreal, Quebec, Canada
*50 free lookup(s) per month.
No credit card required.
Mehdi Masoudfar’s Emails mm****@ai****.net
Mehdi Masoudfar’s Phone Numbers No phone number available.
Social Media
Mehdi Masoudfar’s Location Montreal, Quebec, Canada
Mehdi Masoudfar’s Expertise +20 years experience and expertise in PIPNG -MECHANICAL design and engineering ,reinforced by fabrication and manufacturing, procurement, project engineering, QA/QC, Construction and field engineering knowledge and experience. Industries involved: Oil and gas, petrochemical, Biogas, Agriculture, Food processing and Battery industries. Both in brownfield and greenfield Work experience with international Companies/Clients such as: TOTAL, AGIP, QATAR GAS in multibillion dollar projects in Middle East (Iran, Iraq and Qatar), North Africa ( Libya), Far east ( China), Canada ( Quebec) and Sweden Software knowledge: Autocad et SolidWorks , PDMS , NavisWorks, Plant 3D and PDMS Language: English, French Strong intercompany liaison, result oriented, problem solving, and time and task management skills Field of expertise: • Well understanding of conceptual design, basic design and detail design phase and its requirements. Knowledge of code and standards for piping systems and oil & gas mechanical equipment (pressure vessels, heat exchangers, boilers, tanks) such as ASME Section I, II ,V, IX,VIII Div 1, B31.3, B31.1 , B31.4, B31.8, ASTM, API 650 /620 /510,Nace, SSPC, TEMA,BS,CSA. • Software knowledge: ( Soild works, Autocad, Plant 3D, Navisworks, PDMS, Ceasar II) • Executing 3D modeling and 2D drafting and model review for mechanical equipment and piping; • Piping Mechanical design studies, calculations and review • Preparation of specification and Criteira for Piping design, Piping Material, Pipe support & stress • Piping documents development ( Plot plan and layouts, P-ID, datasheets, line list, PMS,MTO, etc) • P&ID and associated drawings interpretation and analysis with strong attention to detail • Piping route study in cost and flexibility point of view • Good knowledge of Piping Mechanical material selection and substitution • Cost estimation in design phase associated with procurement and Construction phases • Review of Plant in Constructability, operability, maintainability and HAZOP study. • Piping Material estimation in design phases • Create and develop piping project schedule in basic design, detail design, procurement, construction and commissioning. • Piping resources estimation and management in Construction phase • Piping and mechanical Inspection, construction, commissioning and maintenance. • Knowledge of process, instrumentation, safety requirements and Interfaces solution • Cost estimation of CAPEX and OPEX in Conceptual and Basic design phases • Cost estimation and Project scheduling in Construction phase.
Mehdi Masoudfar’s Current Industry Tetra Tech
Mehdi
Masoudfar’s Prior Industry
Hyundai Heavy Industries
|
Sgs
|
Jahanpars
|
Dor Riz Engineering And Construction
|
Gama Power Systems
|
Taknia Engineering
|
Iran Itok
|
Nargan
|
Irico
|
Petrochina International Iraq Fze Iraq Branch
|
Rpa
|
Cegep Saint Leurant
|
Le Groupe Simoneau
|
Xebec Adsorption
|
Dedert
|
Igrl Consultants
|
Freelance
|
Pyro Green Gas
|
Tetra Tech
Not the Mehdi Masoudfar you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Tetra Tech
Engineering Professional
Mon Jan 01 2024 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Pyro Green Gas
Project Manager
Sat Oct 01 2022 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Oct 01 2023 00:00:00 GMT+0000 (Coordinated Universal Time)
Freelance
Piping consultant, QA-QC consultant;
Tue Mar 01 2022 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Oct 01 2022 00:00:00 GMT+0000 (Coordinated Universal Time)
Igrl Consultants
Senior Piping and Mechanical Designer
Thu Apr 01 2021 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Mar 01 2022 00:00:00 GMT+0000 (Coordinated Universal Time)
Dedert
Mechanical and Process Piping designer
Tue Oct 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jan 01 2021 00:00:00 GMT+0000 (Coordinated Universal Time)
Xebec Adsorption
Product lead ( Natural Gas)
Thu Nov 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Sep 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time)
Xebec Adsorption
Piping Mechanical Designer
Fri Jun 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Sep 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time)
Xebec Adsorption
Piping-Mechanical Drafter
Fri Dec 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jun 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time)
Le Groupe Simoneau
Mechanical designer ( Internship)
Tue Aug 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Sep 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time)
Cegep Saint Leurant
AEC in Autocad and SolidWorks 2017, Advance
Wed Mar 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Aug 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time)
Rpa
Mechanical Design Engineer/Inspector
Thu Jan 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jan 01 2016 00:00:00 GMT+0000 (Coordinated Universal Time)
Petrochina International Iraq Fze Iraq Branch
Mechanical Design Engineer
Sat Feb 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Aug 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Nargan
Senior Piping design engineer
Fri Jan 01 2010 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Jan 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Irico
Senior QA/QC Inspector
Fri Jan 01 2010 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jan 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time)
Taknia Engineering
Lead Piping Design Engineer
Tue Jan 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Jan 01 2010 00:00:00 GMT+0000 (Coordinated Universal Time)
Iran Itok
Piping Design Engineer
Tue Jan 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jan 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time)
Gama Power Systems
Piping chief supervisor
Mon Jan 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jan 01 2008 00:00:00 GMT+0000 (Coordinated Universal Time)
Dor Riz Engineering And Construction
Piping/ Mechanical Construction Manager
Sun Jan 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Jan 01 2007 00:00:00 GMT+0000 (Coordinated Universal Time)
Sgs
QA/QC Inspector( storage tank, piping, structure )
Sat Jan 01 2005 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Jan 01 2006 00:00:00 GMT+0000 (Coordinated Universal Time)
Sgs
QC Inspector -Pressure Vessel
Thu Jan 01 2004 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Jan 01 2005 00:00:00 GMT+0000 (Coordinated Universal Time)
Jahanpars
Piping-Mechanical Field Engineer
Thu Jan 01 2004 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Dec 01 2004 00:00:00 GMT+0000 (Coordinated Universal Time)
Hyundai Heavy Industries
Piping Field Engineer
Sat Sep 01 2001 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Sep 01 2003 00:00:00 GMT+0000 (Coordinated Universal Time)