
Sinan Kuvan
Currently, the demand for the transportation of passengers and automobiles over the Caspian Sea is not met due... | Turkey
*50 free lookup(s) per month.
No credit card required.
Sinan Kuvan’s Emails si****@ga****.com
Sinan Kuvan’s Phone Numbers No phone number available.
Social Media
Sinan Kuvan’s Location Turkey
Sinan Kuvan’s Expertise Currently, the demand for the transportation of passengers and automobiles over the Caspian Sea is not met due to the lack of specialised vessels. Dry-cargo freighters, oil tankers and railway ferries are operating in a scheduled service between ports on the Caspian Sea.Thus, the development of the RO/PAX terminal is a priority project in respect of the development of Turkmenbashi International Seaport.Major duties of the service to be established will include offshore rescue operations within the responsibility area of Turkmenistan State Marine and River Transportation Service, handling accidental spills of oil and petroleum products, and the performance of the underwater technical work. To this end, it will need appropriate equipment and vessels, such as: - protective booms; -spilled oil skimming equipment; -environmental vessels. Yeni Askabat Uluslararası Havaalanı, Turkmenistan’ın hızla artan yerli ve yabancı yolcu trafigine cevap verebilmek uzere mevcut havaalanı tesislerinin yerine insa edilmektedir.Turkmenistan’ın milli sembollerinden esinlenerek tasarlanan yeni terminal binası, yaklasık 150.000 m² kapalı alanı ile yılda 14 milyon yerli ve yabancı yolcuyu IATA Class A hizmet standartlarında agırlayabilecektir. Binada, toplam 24 adet yolcu koprulu binis kapısı bulunmaktadır. Yeni havaalanı projesi kapsamında insa edilecek olan VIP terminali, hava trafik kontrol kulesi, toplam 3.000 arac kapasiteli acık ve kapalı yolcu otoparkları, yılda 200.000 ton yuk kapasiteli kargo terminali, 3 ucak kapasiteli ucak bakım hangarı, catering binası, yeni yakıt ikmal tesisleri, itfaiye binaları, bakım-onarım ve ambar tesisleri, sivil havacılık okulu, ucus ve kabin egitim simulator binası, hastane, yurt binası, kapalı spor salonu ve diger idari ve teknik yardımcı tesislerle birlikte Askabat Uluslararası Havaalanı’nda yaklasık 350.000 m² kapalı alan mevcuttur.Mevcut malzeme tasıma sisteminin kontrollerinin yapılması.Hat uzerinde degismesi gereken noktalar icin celik imalat yapılması. Mevcut hatların kumlanıp boyanması. Temel ve detay muhendislik. Imalat ve temin (konveyor, torbalı filtre, kontrol sistemi vs.). Gemi bosaltma ve yukleme vinclerinin bakımı. Yeni transformatorler, kablolar, kablo makaraları temini. Tum insaat isleri. Devreye alma ve testler.Hidro Elektirik Santrali Insaatı AKSU HES Proje yeri Dogu Anadolu Bolgesi'nde Adıyaman Ili sınırları icerisinde Sincik ilcesinden gecen Aksu Deresi uzerinde yer almaktadır. Insasına 2011 yılında baslanılmıstır.Proje suresi 9 ay olarak ongorulmustur.Proje omru ise 49 yıldır. Aksu Proje kapsamında Regulator (8m genisliginde, 5 m yukseklikte, 20 m uzunlugunda) (beton dolu govde) Cokeltim Havuzu (40 metre uzunlugunda, 5 metre genisliginde) Iletim Kanalı (5293 metre uzunlugunda, 1.60*1.60kutu kesit) Yukleme Havuzu (20 metre uzunlugunda, 8 metre genisliginde,10.5 m yuksekliginde) Cebri Boru (363metre uzunlugunda 1.0 metre capında) Hidroelektrik Santral (5.77 MWe gucunde) Enerji Iletim Hattı tesisleri yer almaktadır.Halihazır harita yapımı, Imar uygulamaları, Kadastro yapımı, Kamulastırma projeleri, Yol ve etud projeleri,. Haritacılık faliyetleri.
Sinan Kuvan’s Current Industry S.S. Platformizmim
Sinan
Kuvan’s Prior Industry
OLGUN HARİTA
|
DOĞAN HARİTA PLANLAMA
|
HNS HARİTA İNŞAAT
|
YG INSAAT
|
Partner Teknik
|
Polimeks
|
ATAÇELİK
|
GAP Construction
|
Nurem İnşaat AŞ.
|
S.S. Platformizmim
Not the Sinan Kuvan you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

S.S. Platformizmim
Survey Technician
Fri Mar 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Nurem İnşaat AŞ.
Survey Technician
Sun Oct 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Mar 01 2019 00:00:00 GMT+0000 (Coordinated Universal Time)
GAP Construction
Türkmenbash International Seaport Project
Fri May 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Apr 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time)
ATAÇELİK
Toksöz Holding Sanset Gıda Fabrikası / Arven İlaç Fabrikası
Mon Dec 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Apr 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time)
Polimeks
Ashgabat International Airport Project
Fri Aug 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Nov 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Partner Teknik
Libya Demir Çelik Kompleksi (Libyan Iron and Steel Complex)LISCO.
Wed Aug 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Tue Jul 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
YG INSAAT
Aksu Hidro elektirik santrali projesi/Suryapı
Thu Mar 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Jul 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
HNS HARİTA İNŞAAT
Haritacılık Faliyetleri
Sat May 01 2004 00:00:00 GMT+0000 (Coordinated Universal Time) — Thu Mar 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)
DOĞAN HARİTA PLANLAMA
Haritacılık
Wed Jul 01 1998 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Nov 01 2002 00:00:00 GMT+0000 (Coordinated Universal Time)
OLGUN HARİTA
STAJ
Mon Sep 01 1997 00:00:00 GMT+0000 (Coordinated Universal Time) — Mon Jun 01 1998 00:00:00 GMT+0000 (Coordinated Universal Time)