
Todd Embryk
I started Work in the Electrical Utility industry in 1997 with BC Hydro (British Columbia Hydro and Power... | Fort McMurray, Alberta, Canada
*50 free lookup(s) per month.
No credit card required.
Todd Embryk’s Emails te****@su****.com
Todd Embryk’s Phone Numbers No phone number available.
Social Media
Todd Embryk’s Location Fort McMurray, Alberta, Canada
Todd Embryk’s Expertise I started Work in the Electrical Utility industry in 1997 with BC Hydro (British Columbia Hydro and Power Authority. I have work experience in both High Voltage Electrical Control Center operations and Hydro-electric Plant Operations. During this time a took a 3.5 year Apprenticeship with BC Hydro on Power system Operations and became a Journeyman in 2002. I worked with BC Hydro for 15 years and decided to make a change and try something a little bit different. I moved to Churchill Falls In Labrador and started working as a Plant Operator with Nalcor Energy. This is a major generating Station which produces approx. 5600 MW of electricity. My wife and I decided that this location was too isolated and decided to take a job with Suncor Energy as an Electrical Power System Operator. I have since become a NERC certified Transmission Operator which is required to Operate the High Voltage Electrically integrated power system throughout North America.
Todd Embryk’s Current Industry Suncor Energy
Todd
Embryk’s Prior Industry
Bc Hydro
|
Nalcor Energy
|
Suncor Energy
Not the Todd Embryk you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Suncor Energy
Power System Operator
Mon Apr 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Nalcor Energy
Power Plant Operator
Tue May 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time) — Fri Mar 01 2013 00:00:00 GMT+0000 (Coordinated Universal Time)
Bc Hydro
Operator/Area Dispatcher
Thu May 01 1997 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Apr 01 2012 00:00:00 GMT+0000 (Coordinated Universal Time)