
Zulfaini Abidin
ACCOMPLISHMENT * Working at PT.Indah Kiat Pulp & Paper Tbk (2009-2014) Project Maintenance Improvement : FMD Numbering Drawing System -... | Aceh, Aceh, Indonesia
*50 free lookup(s) per month.
No credit card required.
Zulfaini Abidin’s Emails zu****@me****.com
Zulfaini Abidin’s Phone Numbers 1337237****
Social Media
Zulfaini Abidin’s Location Aceh, Aceh, Indonesia
Zulfaini Abidin’s Expertise ACCOMPLISHMENT * Working at PT.Indah Kiat Pulp & Paper Tbk (2009-2014) Project Maintenance Improvement : FMD Numbering Drawing System - Planning and implementation numbering drawing system for optimization spare part management, inventory control, mechanical drawing control - Position : Project Leader Maintenance Management Improvement : Improve FMD maintenance Strategy to Reduce Unplanned - Implementation of optimal maintenance management to reduce unplanned downtime cause by mechanical damage on production machines - Position : Co-Leader Project Project machine improvement : Modification Hydraulic System B-Flute in the corrugator machine - Position : Team Modification - Certificate of appreciation, certificate number :148/IKPP-HR/P/XII/2012 Project machine improvement : Redesign to paper roll transfer section in the RCS Machine - Modification of paper roll transfer section can be good operation and easy maintenance - Position : Project Leader * Working at PT. Permata Hijau Palm Oleo (2014- 2015) Project Redesign : Redesign pipe system in compressor unit at the molding plant -Redesign compressors piping system prescribe engineer standard -Plan working drawings and estimate material usage -Position : Co-Leader Project Prepare Documents ISO 22000 maintenance -To create WI documents prescribe maintenance standard procedure -Implementation and socialization to all maintenance personnel Program Maintenance Management Improvement : Implementation and optimization spare part management & inventory controller management - Set up bill of material to all plant - Set up critical spare part and sync with bill of material Goal of Achievement - Zero breakdown caused by waiting spare part - Reduce lost time job because waiting spare part - Optimize maintenance cost and yearly budgeting is right *Working at PT. Smart Tbk (2015-Present) - implement Predictive Maintenance with integration to sap-pm system ( complete 100% april 2016)
Zulfaini Abidin’s Current Industry Medco E And P
Zulfaini
Abidin’s Prior Industry
Pt Medco Energi Internasional Tbk
|
Asia Pulp And Paper
|
Permata Hijau
|
Pt Smart Tbk
|
Medco E And P
Not the Zulfaini Abidin you were looking for?
Find accurate emails & phone numbers for over 700M professionals.
Work Experience

Medco E And P
Planner & Scheduler Integrated Maintenance Block A Aceh & Tarakan Asset
Wed Dec 01 2021 00:00:00 GMT+0000 (Coordinated Universal Time) — Present
Medco E And P
Spv Production & Maintenance Planning
Wed Aug 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Dec 01 2021 00:00:00 GMT+0000 (Coordinated Universal Time)
Medco E And P
Condition Monitoring & Analysis
Tue Aug 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time) — Wed Aug 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time)
Pt Smart Tbk
Maintenance Supervisor
Tue Dec 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time) — Sat Jul 01 2017 00:00:00 GMT+0000 (Coordinated Universal Time)
Permata Hijau
Mechanical Engineer
Thu May 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time) — Sun Nov 01 2015 00:00:00 GMT+0000 (Coordinated Universal Time)
Asia Pulp And Paper
Mechanical Engineer
Sun Nov 01 2009 00:00:00 GMT+0000 (Coordinated Universal Time) — Thu May 01 2014 00:00:00 GMT+0000 (Coordinated Universal Time)
Pt Medco Energi Internasional Tbk
Planner and Scheduler Integrated Maintenance Block A Aceh and Tarakan Asset
— Present